Iteration directions and admission conditions

The next iteration continues from the 0.2.1 software preview, preserving the identity of historical sealed candidates. See subsequent iterations for 71 planning entries and dependencies; maintain status and exits only in the original delivery ledger, without a completion percentage here.

Order

Main delivery

Admission and exit conditions

Software first

Baseline navigation, configuration explanations, plan previews and complete development operations

B, C01, T01 and X01; reuse existing capabilities without new ledgers or test frameworks

Independent integration

External SoC/provider, CMake and installed SDK

P; explicit package identity reaches resolution, queries, generation and build, with actual external-fixture success

Practical use

Industrial-control and bounded secure-networking reference systems

D/R/N/S/E; first fix exact combinations and budgets, then complete failure, shutdown and recovery

After equipment connection

Stations and per-mode measurements for the three initial and source-reference boards

H; follow HIL status and original station contracts; tooling is not physical execution

Integration exit

Current clean-source candidate, SDK, bilingual docs and publication

L; execute the complete plan and independent offline reproduction without inheriting preview or old-candidate qualification

Conditional extensions

Exact PM, a second sensor, filesystems and advanced SoC modes

R04/R05/S06 and original SoC exits; enter through actual requirements and hardware contracts

Codex owns all maintenance domains without requiring named accounts. Retain independent review for high-risk changes; execute actual RED before GREEN for new behavior and fixes, using GoogleTest/GoogleMock for C contracts. Judge server rules from actual readback and retain product policy and private data in external projects.